Okay- we had a week at the fair (well some of us did) and we had to get back to work today. Unfortunately, all of us here at Sweetwater (except the kids!) had Pink Eye-some worse than others- for the greater part of the last two weeks. So after 4 different antibiotics, 3 trips to the doctor and one visit to the ER, we have all recovered and feel much better this week.
Unfortunately, there is a whole lot of work to, so there is no time to relax. Last week, the workers started laying our Travertine floors in the bathrooms, and today, the hardwood floors are being installed. There is a lot of area to do, so it will take them more than a week to get all the floors done. We will post pictures of the progress.
Dan and Susan have been busy with the landscaping project- here are photos of the black iron fence in the front yard and the privacy fence (which extends to the back yard) they installed. We don't know what we would do without Dan (Susan's husband). Although he is an absolute perfectionist and drives Susan crazy about every little detail, we appreciate all his hard work!
We are busy creating our make- and- take projects for our exciting open house on September 15th. Don't forget- there are only 2 days left to make a reservation for the house if you want to be entered in the drawing for a free stay. Hope you enjoy the photos, we will get more up soon!